Harvest - Splitting Loads Between Two Fields or Two Bins
Splitting a Load Between Two Fields
There is no built-in method of splitting a truck load between two fields. This can be done manually by editing and decreasing the transaction weight on Field #1 and then adding a manual transaction to Field #2.
If the weight is still on the grain cart and it is moving to a new field, another option is to add a manual load to Field #1 for the weight on the cart, then add a manual transaction for the same cart weight as a negative to Field #2, then swap the active field to Field #2. Unload the cart as normal. The excess weight from field #1 will fill the negative manual transaction and the total will only be the weight from Field #2.
Splitting a Load Between Two Bins
There is no built-in method of splitting a truck load between two bins. This can be done manually by emptying the full truck into Bin #1 and transfer the estimated weight into Bin #2.
- Select the Destinations tab.
- Tap the destination group name to advance to destinations assigned to that group.
- Tap the pencil next to the destination name (Bin #1).
- Tap Add Transfer, type in an amount to transfer out, and then tap Target to select a destination to transfer to (Bin #2).