Cart - Splitting Loads Between Two Fields or Two Bins

Splitting a Load Between Two Fields

There is no built-in method of splitting a truck load between two fields. A workaround is to edit and decrease the transaction weight on Field #1 and add a manual transaction to Field #2. 

Splitting a Load Between Two Bins

There is no built-in method of splitting a truck load between two bins. A workaround is to empty the full truck into Bin #1 and transfer the estimated weight into Bin #2. 

  1. Select the Destinations tab.
  2. Tap the destination group name to advance to destinations assigned to that group. 
  3. Tap ( i ) next to the destination name (Bin #1).
  4. Tap Add Transfer, type in an amount to transfer out, and then tap Target to select a destination to transfer to (Bin #2).