Cart - Splitting Loads Between Two Fields or Two Bins
Splitting a Load Between Two Fields
There is no built-in method of splitting a truck load between two fields. A workaround is to edit and decrease the transaction weight on Field #1 and add a manual transaction to Field #2.
Splitting a Load Between Two Bins
There is no built-in method of splitting a truck load between two bins. A workaround is to empty the full truck into Bin #1 and transfer the estimated weight into Bin #2.
- Select the Destinations tab.
- Tap the destination group name to advance to destinations assigned to that group.
- Tap ( i ) next to the destination name (Bin #1).
- Tap Add Transfer, type in an amount to transfer out, and then tap Target to select a destination to transfer to (Bin #2).